QB1 and QB2 pumping rooms
Pumping rooms and hydraulic curtain at 4,600 m a.s.l.: fabrication, installation and commissioning, with PLC and fiber optic communications.

For Aspec, with Teck's Quebrada Blanca mine as end client, we fabricated, installed and commissioned the pumping rooms for the hydraulic curtain of the QB1 and QB2 projects, at 4,600 meters above sea level, with PLC control and fiber optic communications.