QB1 and QB2 pumping rooms

Pumping rooms and hydraulic curtain at 4,600 m a.s.l.: fabrication, installation and commissioning, with PLC and fiber optic communications.

Pumping room being fabricated in the SOCIAT workshop for the Quebrada Blanca mine

For Aspec, with Teck's Quebrada Blanca mine as end client, we fabricated, installed and commissioned the pumping rooms for the hydraulic curtain of the QB1 and QB2 projects, at 4,600 meters above sea level, with PLC control and fiber optic communications.