YearClientProjectScope
2026 Aguas Santiago Norte Santa María de Maipú and Santa Teresa plants Electrical installation for the Santa María de Maipú drinking water and wastewater treatment plants and the Santa Teresa drinking water plant, medium voltage line and 200 kVA substation.
2025 Ecorriles and Almar Water El Peñón reverse osmosis plant, 60 m³/h Installation and commissioning of a 60 m³/h reverse osmosis plant.
2025 Google Data Luna data center Filtration system and electrical switchboards.
2022–23 Almar Water and Ceita Antucoya mine Two reverse osmosis plants and one 60 m³/h filtration plant, switchboard and valve manifold.
2021–22 Aguas Santiago Reina Norte MV/LV switchboards, installation and commissioning for wastewater and drinking water treatment plants and wells.
2019 Teck Quebrada Blanca4,600 m a.s.l., Tarapacá Region Hydraulic curtain No. 2 and pumping station No. 4: design, fabrication, installation and commissioning.
2016–17 Aspec and Teck QB1 and QB2 pumping rooms4,600 m a.s.l., Tarapacá Region Pumping rooms and hydraulic curtain at 4,600 m a.s.l.: fabrication, installation and commissioning, with PLC and fiber optic communications.
2016–18 Osmoflo and Aguas San Isidro Los Molles desalination plantLos Molles, Valparaíso Region 10 L/s reverse osmosis desalination plant for drinking water: fabrication, switchboards, PLC, HMI and SCADA, and commissioning.
2016 Osmoflo and Aguas del Altiplano Santa Rosa arsenic removalIquique and Alto Hospicio Expansion of the drinking water system for arsenic removal, 390 L/s: power and control switchboards, PLC, HMI and SCADA, and commissioning.
2013–14 Aguas del Altiplano and Osmoflo Cavancha pumping stationIquique Cavancha drinking water pumping station in Iquique: fabrication, installation and commissioning.
2009–11 Codelco Andina and Veolia PDA Phase 1 and Mantos de la Luna Heating and dosing at PDA Phase 1; Mantos de la Luna desalination plant.
Aguas San Isidro Padre Hurtado wastewater treatment plantPadre Hurtado, Santiago Metropolitan Region Fabrication, installation and commissioning of the power and control electrical systems for the wastewater treatment plant.
AIP Ingeniería Containerized electrical room Fabrication of a containerized electrical room with its switchboards.
Aquainnovo Lenca fish farmLenca, Los Lagos Region Corrective maintenance of heat exchangers, fabrication of stainless steel parts and plate restoration.
Cobra Montajes 3,600 A power switchboardMejillones 3,600 A power switchboard for a rental desalination plant, Caitán project.
Inquinat and Constructora TTU Floc-clarifiers and multimedia filtersNavidad, Licancheu area Design and fabrication of three floc-clarifiers and one multimedia pressure filter for a flow of 282 m³/h.
Multiexport HornopirénHornopirén, Los Lagos Region Tank restoration, check valves, condenser replacement and infrastructure upgrades in HDPE and stainless steel.
Osmoflo and Antucoya mine Desalination plant pump room Containerized pump room for a desalination plant: design, fabrication, installation and commissioning.
Xylem and Aguas del Altiplano Azapa Valley arsenic removal plantArica 150 L/s adsorption and reverse osmosis plant: design, fabrication, installation and commissioning.